 | Most innovative options in steel buildings are pre-engineered steel buildings. |
 | Planned, designed and almost pre-built at the factory level. |
 | Assembled after they reach the building site. |
 | Pre-drilled, pre-cut and pre-welded and just need to be bolted together. |
 | On site minimum professional assistance is required. |
 | Large volume of standard product can be provided. |
 | Custom made design product available on demand. |
 | 2-3 skeleton buildings can be made in a day. |